How long does a kitchen installation take?

The short answer: once the design is approved and the deposit is paid, our quotes give 7 to 14 working days for your kitchen to be made and installed. Here is the whole timeline, from first message to handover, and what makes it quicker or slower.

Grey handleless kitchen in Avondale, Harare, with lit glass display cabinets and an LED-lit shelf above quartz worktops

The short answer

  • Making and installing the kitchen: an estimated 7 to 14 working days after the deposit is confirmed. This is the timeline written into our quotes.
  • From first site visit to a finished kitchen: most kitchen renovations take 2 to 4 weeks, depending mostly on how quickly the design is agreed and whether any building, plumbing or electrical work is needed first.
  • Small, straightforward kitchens can be quicker. One client wrote in a Google review that their mother’s kitchen in Gweru was complete in 4 days.

The timeline, stage by stage

  1. Site visit. We come to your home, measure the room and talk through what you want. We also look at plumbing and electrical points, walls and floors, because they affect the design and the schedule.
  2. Quote and 3D design. You get a written, itemised quote and a 3D design of your kitchen. How long this stage takes is mostly up to you: some clients approve the first design, others try two or three colour schemes first.
  3. Deposit. Your installation date is booked once the deposit is confirmed and the site is ready. Nothing is cut until the design is approved, so changes are free at this stage.
  4. Manufacture and installation. Your units are made to your exact measurements, then our own crew removes the old kitchen if needed and installs the new one. This is the 7 to 14 working days.
  5. Final walkthrough. We check every door, drawer and finish with you before we call the job done.
Straight-on view of the Avondale kitchen wall run: two glass display cabinets, grey wall units and a lit open shelf
A kitchen we made and installed in Avondale: Glass Display Kitchen, Avondale

What makes it take longer

  • Changing the design after approval. Our quotes note that changes requested after approval may affect pricing and timelines, because units may already be in production.
  • A room that is not ready. If plastering, tiling, plumbing or electrical work is still going on, installation has to wait. Our quotes exclude electrical, plumbing and building work unless they are listed, so book those trades early.
  • Appliances that are not chosen. The units are built around your fridge, oven, hob and washing machine. Confirm the models before the design is finalised.
  • A bigger kitchen. An island, a scullery or a pantry adds units to make and fit. Our kitchen cabinet prices guide shows how size affects cost as well.
  • Distance. Outside Harare, the work is planned around travel, so it can take longer to schedule. See areas we cover.

How to keep it on schedule

  • Have your appliance sizes or model numbers ready at the site visit.
  • Agree any plumbing or electrical changes early, so they are done before installation day.
  • Clear the kitchen and the route in from the gate before the crew arrives.
  • If you are doing ceilings, skimming or painting too, do them in the right order: ceilings and wall repairs first, then the kitchen, then the final paint touch-ups. Our team does all of these, so we plan the order for you.

Living without a kitchen for a week or two

Most families manage with a kettle, a microwave and a two-plate stove set up in another room, and the braai. Plan simple meals for the installation days, and keep the fridge running somewhere else in the house if you can. We keep the site tidy every day and keep you updated on WhatsApp, so you know when the kitchen will be usable again.

New build or renovation?

In a new house there is nothing to strip out, but the kitchen can only go in once the floors are laid and the walls are plastered and dry. Call us before the plaster goes on, so the plumbing, electrical points and lighting are placed where the design needs them. We explain this in more detail for new homes in areas such as Crowhill, Chishawasha and Glen Lorne.

In a renovation, the old kitchen comes out first. Older homes in suburbs like Avondale and Borrowdale sometimes need walls repaired or services moved, which we pick up at the site visit so the schedule allows for it. For the full renovation process, see our step-by-step guide.

Ready to plan yours? Book a site visit on WhatsApp and we will give you a written quote, a 3D design and an installation window that fits your plans. See our kitchens.

Talk to us about your kitchens. A site visit anywhere in Zimbabwe to measure up, a written quote, and a 3D design before we build.

(01) FAQ

Frequently Asked Questions

How long does it take to install a kitchen?

Our quotes give an estimated 7 to 14 working days to make and install a kitchen once the deposit is confirmed and the site is ready. From first site visit to a finished kitchen, most renovations take 2 to 4 weeks.

What delays a kitchen installation?

The most common causes are design changes after approval, a room that is not ready (plastering, plumbing or electrical work still going on), appliances not yet chosen, and larger kitchens with an island, scullery or pantry.

Can I use my kitchen during installation?

Usually not while the old kitchen is being removed and the new one fitted. Most families set up a kettle, microwave and small stove in another room for those days.