Planning a kitchen renovation in Harare: a step-by-step guide

A kitchen renovation is easier when you know what happens and when. This is how a typical project runs with us, from first message to final walkthrough.

White island kitchen in Avondale, Harare, with a slatted timber island, marble-look worktop and slatted timber ceiling feature

Step 1: Get your ideas together

Before anyone measures, think about how you use your kitchen. Who cooks? Do you need more storage, more counter space, or room to eat? Save photos of kitchens you like, and note your appliance sizes: fridge, stove, oven, microwave and dishwasher.

Step 2: Site visit

We come to your home, measure the room and talk through what you want. We also look at plumbing and electrical points, walls and floors, because these affect the design and the price.

Step 3: Quote and 3D design

You receive a written, itemised quote, and we draw your kitchen in 3D so you can check the layout, colours and finishes before anything is built. This is the time to make changes: moving a unit on screen is free, moving it after it is built is not.

Your quote shows the price for cash and for payment plans of up to six months. Choosing between matte and gloss or granite and quartz? We can quote both.

Step 4: Deposit and manufacture

Once you approve the design, a deposit confirms the order and we start making your units to your exact measurements.

Step 5: Removal and installation

We remove the old kitchen if needed and install the new one with our own crew. We keep the site tidy and keep you updated on WhatsApp. Our quotes give an estimated installation timeline of 7 to 14 working days after the deposit is confirmed. Most kitchen renovations take 2 to 4 weeks from start to finish. Replacing cabinets alone can be quicker; a full remodel with layout changes can take longer.

Step 6: Final walkthrough

We check every door, drawer and finish with you before we call the job done.

Tips to avoid delays

  • Confirm your appliances before the design is finalised. Units are built around them.
  • Agree any plumbing or electrical changes early, so they are done before the units arrive.
  • Clear the kitchen before installation day, and plan where you will cook in the meantime.
  • Doing ceilings, skimming or painting too? Do them in the right order with one team. We do all of them, so everything finishes together.

Ready to start? Book a site visit on WhatsApp or see our kitchens.

Talk to us about your kitchens. A site visit anywhere in Zimbabwe to measure up, a written quote, and a 3D design before we build.

(01) FAQ

Frequently Asked Questions

How long does a kitchen renovation take in Harare?

Most kitchen renovations take 2 to 4 weeks. Replacing cabinets alone can be quicker, and a full remodel with layout changes can take longer.

Do I need a design before getting a kitchen built?

It is strongly recommended. We draw every kitchen in 3D first so you can check the layout and finishes before anything is made.

Is there a charge for the site visit?

Yes. A site visit fee covers our transport to your home. We confirm the amount when you book, then we measure up, talk through the job and send a written, itemised quote.